
Whether you're opening a new boutique on Main Street in Huntsville, renovating a flagship in Bracebridge, or rolling out a multi-location concept across the Muskoka region, we build retail spaces that hit a hard opening date. Brand-spec millwork, feature lighting, point-of-sale wiring, accessibility upgrades, and tradesperson scheduling that respects your trading hours.
The same general contractor, with a playbook tuned to how you actually make money on the property.
Fixed-price, schedule-driven contracts with daily site reporting against a Gantt your landlord and brand team can see live.
Most retail renovations completed overnight and on Mondays so you keep trading through the build.
We work to your brand standards manual, source custom millwork, and coordinate signage installers and lighting reps directly.
Repeatable build kits, central project management, and standardized punch lists for chains opening 3 to 15 locations.
Demising, glazing, HVAC, sprinkler relocation, lighting, flooring, and finishes from white-box to grand opening.
Refits scheduled across slow weeks to refresh aging storefronts without losing trading days.
We build display cases, cash wraps, back-of-house, and brand-spec fixtures.
Track lighting design, illuminated channel-letter signage, and awning installs with permits handled.
AODA-compliant entrances, washrooms, change rooms, and counter heights.
We work directly with your landlord's construction manager on tenant-improvement scope, drawings, and schedule.
Sample boards and material approvals signed off by your brand team before any finishes are ordered.
Backward-scheduled from your soft-open, with weekly milestone reviews and a punch-list cleared 48 hours before doors open.
Our team is on-site for the first 72 hours of trading to handle any snags.
"They opened our second location two days ahead of schedule, overnight installs only, no lost trading days at the original store. Worth every dollar."
For most refreshes yes. We use temporary partitions, work overnight and Mondays, and stage materials off-site. Full gut renos usually require a 5 to 10 day closure we schedule into your slowest week.
Yes. We've executed multi-location rollouts to brand-standards manuals from national retailers and franchisors. Sample sign-off is built into our process.
We pull signage and tenant-improvement permits with the Town of Huntsville, Town of Bracebridge, Township of Muskoka Lakes, and District of Muskoka.
Yes. Single project manager across all sites, standardized build kits, and shared punch-list system so location 12 opens with the same quality as location 1.

Walk the site with us. We follow up with a fixed-price proposal, usually within two weeks.