
Boathouses and docks are the most regulated structures on the lake. We design, permit, and build single and two-storey boathouses, crib docks, and floating docks across Muskoka.
Boathouses and docks are the most regulated structures on the lake. We design, permit, and build single and two-storey boathouses, crib docks, and floating docks across Muskoka.
Boathouses live or die at the application stage. We start every project with a footprint review, zoning check, and MNRF/DFO assessment before any design work begins.
Crib docks for permanence on protected lakes. Pile docks for faster install and lower lake-bed impact. Floating docks for severe ice or shifting water levels. Each chosen for the specific lake and bottom.
Barge staging, in-water work windows, marine concrete pours, and coordinated lift, boat, and slip installs. We've worked every Muskoka lake and most of Georgian Bay.
Two-storey boathouse second levels finished to cottage standards: insulated, plumbed, wired for full-service guest accommodation where zoning permits.
We run the full scope or with vetted partners on a single contract. Here's what typically lands inside this kind of project.
Steel piles or rebuilt timber cribs sized for ice and wave loads.
PT or steel framing built for moisture and shoreline conditions.
Metal roofing and sundeck systems above the slip.
GFCI circuits, lift wiring, dock outlets, and shoreline lighting.
Boat lifts, doors, and hoists coordinated with the structure.
MNRF, Parks Canada, and conservation authority approvals.






We love meeting people over a coffee so we can hear them out and understand their vision for the cottage. Boots on the ground in Muskoka, in-person meetings in Toronto, or a video call if your schedule is tight. Pick what works for you.
Most of our clients live in Toronto or the GTA. We meet downtown between site days so you can sketch ideas, swap photos, and walk through scope without driving north.
Our crew lives here. We'll meet you at the cottage, walk the lot, and pull tape on what you're thinking, no appointment shuffling required.
Live video walkthroughs of the site, the build, and the selections. Hit join from anywhere in the world and see the project as if you were standing in it.
Whether the cottage is your full-time home or your getaway, we shape the build sequence around how you actually use the place, and how often you can be on site.
"10-month permit, 9-month build, two-storey boathouse with finished guest suite above. Every milestone hit."
"Crib dock through ice, in-water window held by a week. Marine logistics handled without us thinking about it."
"MNRF application was a year of paperwork. They knew every form."
Boathouses & Docks covers a lot of ground. Browse the specialty that matches your project, each one gets its own deep-dive page with scope, specs, and FAQs.
Single and two-storey boathouses with finished upper-level living space.
View Two-Storey Boathouses detailsPermanent crib-foundation docks for Muskoka lakes.
View Crib Docks detailsFloating docks for shallow shorelines and seasonal flexibility.
View Floating Docks detailsSteel pile docks for deep water and rocky shorelines.
View Pile Docks detailsMNRF, DFO, and municipal applications, often a 6 to 12 month process.
Barge-staged crib pours or pile drives, then framing and roof.
Cedar siding, copper roofing, interior finishes for the upper level.
Often, yes, but rules vary by lake and township. Most builds are replacements or expansions of existing footprints.
Plan for 6 to 12 months from application to in-water work, longer on protected lakes.
Most two-storey builds with finished upper level run $650,000 to $1.6M depending on lake, footprint, and finish level.
Crib for permanence on protected lakes. Pile for faster install with lower lake-bed impact. Floating for severe ice or shifting water.
Where zoning permits. We've built fully insulated, plumbed, and HVAC-equipped second levels with bedrooms, baths, and kitchenettes.
Yes, every step. We prepare, submit, attend agency meetings, and coordinate the in-water work window.
Yes, and replacement is often the only path to a new structure today. Existing footprint and grandfathered rights matter, we review both first.
Crib docks 4 to 8 weeks. Single-storey boathouses 4 to 6 months. Two-storey with finished upper level 7 to 12 months.
Yes. We coordinate lift install, shore power, lighting, and slip equipment with licensed marine electricians.
Yes. We work Georgian Bay, Honey Harbour, and Port Severn regularly. Wind and ice loading are designed in.

Walk the site with us. We follow up with a fixed-price proposal, usually within two weeks.