6 in-depth articles on cottage renovations, written from real Muskoka projects: what things cost, what the permits require, and what we would do on your lot.

Opening up a chopped-up cottage main floor is the single most transformative renovation there is, and the easiest one to overdo. Here is how to decide what comes down.

Barge access, the Big Three lakes, and real permit timelines. What renovating a cottage in Port Carling and the Township of Muskoka Lakes actually involves.

What we check every spring when opening Muskoka cottages: frost heave, roof damage, foundation cracks, shoreline shifts, and plumbing before turning the water back on.

A realistic renovation timeline is 8 to 14 months, not 8 to 14 weeks. Here is where the time actually goes.

A room-by-room Muskoka winterization checklist, and what to actually change if you want to stop closing the cottage every fall.

Every cottage has a list. Here is how to sequence it so the important things get fixed before they become expensive.

Walk the site with us. We follow up with a fixed-price proposal, usually within two weeks.