5 in-depth articles on cottage renovations, written from real Muskoka projects: what things cost, what the permits require, and what we would do on your lot.

Barge access, the Big Three lakes, and real permit timelines. What renovating a cottage in Port Carling and the Township of Muskoka Lakes actually involves.

What we check every spring when opening Muskoka cottages: frost heave, roof damage, foundation cracks, shoreline shifts, and plumbing before turning the water back on.

A realistic renovation timeline is 8 to 14 months, not 8 to 14 weeks. Here is where the time actually goes.

A room-by-room Muskoka winterization checklist, and what to actually change if you want to stop closing the cottage every fall.

Every cottage has a list. Here is how to sequence it so the important things get fixed before they become expensive.

Walk the site with us. We follow up with a fixed-price proposal, usually within two weeks.